Prestigious Corporates
New Launches
Our Partners
Staffing and Placement at


Management Training Partner


INFRASTRUCTURE
  1. No. of Labs – 12 No.
    1. 5 Lab with 30 capacity
    2. 4 Lab with 24 capacity
    3. 2 Lab with 20 capacity
    4. 1 Lab with 12 capacity
  2. No. of Systems available : 154
  3. Systems Configuration
    1. P IV 3.0 GHz/Dual Core 1.6 GHz
      1. 60 Systems with 4 GB RAM
      2. 54 Systems with 2 GB RAM
      3. 40 Systems with 1GB RAM
    2. All TFT Monitors
    3. All systems are with DVD or CD ROM
    4. Structured Networking with 24 port CISCO/D-Link Switches in each room
  4. Cafeteria
  5. Electricity Back-up ( 3 Level Backup)
    1. 4 No. * 3.5KVA Invertor
    2. 17 No. * 3KVA UPS (1 UPS on every 9 Systems)
    3. 3 Gensets 6. Canon ceiling mounted LCD projector in each room with remote.
  6. Canon ceiling mounted LCD projector in each room with remote.
  7. Separate White board, Flipchart and LCD Screen for presentation
  8. Support staff
    1. 7 Office Attendant
    2. 4 Hardware Engineer
    3. 1 System Administrator
    4. 1 Center Manager
  9. 2/3 Carrier AC in each room with proper Genset back-up
  10. Chair & Tables which meets international Standard
  11. Special arrangement for safe parking (Upto 300 Cars at a time)
  12. All facilities viz. Boarding, lodging and Training in the same premises
  13. Guest House for out-location faculty/ participants
  14. Executive Lunch

 

 

Image 1   Image 1
     
Image 1   Image 1
     

3

3 

 

Home | Offerings | Infrastructure | TAI Edge | Corporate View
Careers | Enquiry | Contact Us | About Us
Copyright © Technology Advisors and Integrators
Designed, Developed and Maintained by: MND Technologies